Progress on Bunch Arrival Time Measurements at ELBE


Progress on Bunch Arrival Time Measurements at ELBE

Kuntzsch, M.; Gensch, M.; Lehnert, U.; Schurig, R.; Bousonville, M.; Czwalinna, M. K.; Sydlo, C.; Vilcins, S.; Schlarb, H.; Angelovski, A.; Penirschke, A.

Abstract

The superconducting continuous wave (CW) accelerator ELBE at Helmholtz-Zentrum Dresden-Rossendorf (HZDR) is currently upgraded to generate electron bunches with sub picosecond duration, charges of up to 1 nC at repetition rates of up to 500 kHz (CW). The electron pulses are compressed to their desired length using two magnetic chicanes. To measure the timing of the electron bunches with respect to ELBEs RF reference at the target position a Bunch Arrival-time Monitor (BAM) has been setup and commissioned. Improvements concerning the beamline pickup and readout electronics are discussed which leads to a higher temporal resolution. First measurement results carried out are presented.

Keywords: ELBE Synchronization Bunch Diagnostic Timing

Beteiligte Forschungsanlagen

Verknüpfte Publikationen

  • Poster
    IPAC14 - 5th International Particle Accelerator Conference, 15.-20.06.2014, Dresden, Deutschland

Permalink: https://www.hzdr.de/publications/Publ-21141